ACTIVITY ACTION

Sorry to ask a simple question.

In which way is an Action connected to an Activity (in technical
design). I don't understand which attributes are used, or how it is done?

Thanks for any short answer.

Bert

Maybe there is an inconsistentie between the specs in the PDF's and the
specs in the UML.

Please take a look here:
http://www.openehr.org/uml/release-1.0.1/Browsable/_9_5_1_76d0249_1140195698328_962539_2370Report.html

Missing is the attribute instruction_details which is mentioned in the
document:
http://www.openehr.org/releases/1.0.2/architecture/rm/ehr_im.pdf
(page 73)

I have seen that the UML-link has the wrong Release-ID (1.0.1 instead of
1.0.2), but this where I come when I click my way through the web

Is it possible that this inconsistency confuses me? Or does it have
nothing to do with my previous question?

Thanks for any comment on this
Bert Verhees

Hi Bert,

I can see instruction_details in the UML report - it is under
Attributes from Associations and does indeed contain the references
back to the original instruction/ Activity.

Ian
Dr Ian McNicoll
office +44 (0)1536 414 994
fax +44 (0)1536 516317
mobile +44 (0)775 209 7859
skype ianmcnicoll
ian.mcnicoll@oceaninformatics.com

Clinical Modelling Consultant, Ocean Informatics, UK
Director/Clinical Knowledge Editor openEHR Foundation www.openehr.org/knowledge
Honorary Senior Research Associate, CHIME, UCL
SCIMP Working Group, NHS Scotland
BCS Primary Health Care www.phcsg.org

Sorry, where is my mind, I just missed it.

Bert

Op 29-1-2012 19:04, Ian McNicoll schreef: